Electrical installations, from the main distribution board to the last socket

DISTRIBUTION · SWITCHBOARDS · PRAM

We design and execute heavy-current electrical installations for commercial, industrial and residential buildings in the Bucharest-Ilfov area. We work under ANRE authorizations, in accordance with the I7-2011 code, and at the end we hand over a complete acceptance file, including PRAM measurement reports.

Tablou electric industrial cu automate și siguranțe

What we execute

We execute the building's electrical distribution: risers, cable routes, main and secondary distribution boards assembled in accordance with SR EN 61439. We install socket and power circuits, indoor and outdoor lighting, including emergency lighting. We build earth electrodes, earthing rings and lightning protection systems, sized by calculation in accordance with the I7-2011 code. We close out every job with PRAM measurements: earth resistance, continuity, insulation resistance. We measure, record in reports, and hand over.

Montaj corp de iluminat — lucrare VersaLogic

How we work

A single point of contact takes the job from design to acceptance. In the design phase we establish the distribution scheme, the power balance and the selectivity of protective devices. During execution we work to the approved design, with written site instructions for any change. At commissioning we verify every circuit, perform the PRAM measurements and sign the commissioning report with the client. After acceptance we take over maintenance: periodic inspections, PRAM measurements at the legally required intervals, interventions.

The complete process, with the same team: designexecution → PIF → maintenance.

Șantier VersaLogic — montaj echipamente

Compliance and delivered documentation

We execute under ANRE certifications, with electricians licensed for the works they sign off. We design and verify installations in accordance with the I7-2011 code, and we assemble and test distribution boards in accordance with SR EN 61439-2, with a declaration of conformity for each board. During execution we prepare concealed works reports before routes are closed up. At the end we hand over the acceptance file with a table of contents: whoever looks for a document, finds it. Without a complete file, we do not consider the job finished.

Detaliu execuție instalații — VersaLogic București

What we hand over at acceptance

  • Concealed works report (PVLA) for buried routes and connections
  • PRAM measurement reports: earth resistance, insulation, continuity
  • SR EN 61439-2 declarations of conformity for the delivered distribution boards
  • Commissioning report (PIF) signed with the client
  • As-built documentation with updated single-line diagrams
  • Complete acceptance file, with table of contents
Pat de cabluri pe tavanul unei hale industriale
Trasee de tuburi electrice pe tavan
Lucrare VersaLogic — birouri Criteo, instalații electrice și automatizări

VersaLogic – Your partner in automation and security

Send us the electrical part of your project. We will come back with a quotation itemized by bill-of-quantities lines and a committed execution deadline.